This solar farm will cover approximately 36 hectares of land and generate 21 MW of electricity, powering up to 6000 homes with clean energy. Construction of the solar farm will involve the installation of photovoltaic (PV) panels, which convert sunlight directly into renewable electricity which, once operational, will have a lifespan of up to forty years.

Displacing Carbon Emissions

Over the 40-year lifespan of the project, Kincraig Solar Farm will displace an estimated 380,000 tonnes of CO2 from fossil fuel sources.

Our proposals for Enhancing Biodiversity in the Local Environment

Our proposals involve the creation of new habitats, offering food and shelter to local wildlife. We will continue to develop our plans throughout the build as the site becomes part of the landscape and we welcome local knowledge and input from the community.

Construction

Construction Timeline

Site works for Kincraig Solar Farm will begin in late September 2024. We will make regular updates on construction progress here on the site.

  1. Phase 01
    Current phase

    Site Preparation and Infrastructure Setup

    Installing access roads, fencing, substations, and power lines

  2. Phase 02

    Foundation and Mounting Structure Installation:

    Laying foundation Assembling mounting frames

  3. Phase 03

    Solar Panel and Electrical System Integration

    Placing panels and connecting electrical systems

  4. Phase 04

    Grid Connection and Testing

    Connecting to the grid, comprehensive testing

  5. Phase 05

    Landscaping, Restoration

    Finalizing landscaping, restoring the site

Communications

We understand the importance of open communication and transparency. Throughout the construction process, we are committed to keeping you well-informed about project developments, timelines, and any potential impacts on the local area. Regular updates will be provided through this site, through contact from our UK team and through channels agreed with the local community. You can also get in touch with us through our dedicated email address – Kincraig@europeanenergy.com

  • Entering the construction phase

  • The beginning of construction at Kincraig

European Energy Team

Contacts

Your feedback is valuable to us, and we encourage you to reach out with any questions or concerns. We are dedicated to fostering collaborative and positive relationships as we work together toward a sustainable future.

Lisa Wilson

Project Communications Manager

Documentation

Planning – Documentation and History

The planning applications and associated document history for this project can be found here